Motran

US 67

US 67 Corridor Study

In late 2017, TXDOT began a study of the US 67 corridor from just south of I-10 to the border at Presidio, Texas.  While there had been some previous improvements related to passing lanes on portions of the roadway, there are still safety issues on the portion of the roadway between Presidio and Marfa.

The corridor plan addresses safety and operational improvements to facilitate border trade and commerce, as well as tourism.  The corridor may become more significant to the energy industry in the future with a new natural gas pipeline installed along much of the route that exports natural gas to Mexico, and development of new wells in the Alpine High play.

The corridor study will be completed in 2019 and will include priority projects for consideration in various funding programs.

A link to the TXDOT website with more information on the US 67 Corridor study can be found here:

https://www.txdot.gov/inside-txdot/projects/studies/el-paso/us67-i10-presidio.html

US 67 Major Projects

Crane County

Project: Roadway Widening To A Modified Super 2 from Crockett County Line to Upton County Line

Length: 3.339 Miles

Cost: $4 Million

Bid Received Date: 11/1/2018

Crockett County

Project: Roadway Widening To A Modified Super 2 from Pecos County Line to Crane County Line

Length: 0.849 Miles

Cost: $1 Million

Bid Received Date: 11/1/2018

Pecos County

Project: Roadway Widening To A Modified Super 2 from IH 10 to 16.8 Miles South of IH 10

Length: 15.831 Miles

Cost: $19 Million

Bid Received Date: 4/1/2021

Project: Roadway Widening To A Modified Super 2 from 16.8 Miles South of IH 10 to Brewster County Line

Length: 11.663 Miles

Cost: $14 Million

Bid Received Date: 4/1/2021

Project- Roadway Widening To A Modified Super 2 From IH 10 to Crockett County Line

Length: 22.615 Miles

Cost: $27 Million

Bid Received Date: 11/1/2018

Presidio County-

Project: Construction Of Shared Use Bicycle And Pedestrian Facility A Long Us 67 In The City Of Marfa

Length: 0.36 Miles

Cost: $306,000

Bid Received Date:7/1/2020

Project: New Two-Lane Twin Bridge Structure For Southbound Traffic Into Mexico at the International Demarcation Line and Puerto Rico Street

Length: 0.659 Miles

Cost: $6.8 Million

Bid Received Date: 8/1/2017

Project: Bridge Replacement at the International Demarcation Line and Puerto Rico Street

Length: 0.659 Miles

Cost: $4.5 Million

Bid Received Date: 4/1/2020

Reagan County-

Project: Add Passing Lanes from SH 137 to Upton County Line

Length: 18.516 Miles

Cost: $25.5 Million

Bid Received Date: 3/1/2020

Tom Green County-

Project: Construct Interchange at Tractor Trail

Length: 1.246 Miles

Cost: $20.6 Million

Bid Received Date: 8/1/2018

Project: Construct Interchange at Paulann Boulevard

Length: 0.49 Miles

Cost: $11.8 Million

Bid Received Date: 8/1/2018

Upton County-

Project: Roadway Widening To A Modified Super 2 from Crane County Line to US 385

Length: 4.859 Miles

Cost: $5.8 Million

Bid Received Date: 11/1/2018

Project: Roadway Widening To A Modified Super 2 from SH 329 to US 385

Length: 17.964 Miles

Cost: $29.9 Million

Bid Received Date: 7/1/2019

Project: Roadway Widening To A Modified Super 2 from Reagan County Line to SH 329

Length: 10.267 Miles

Cost: $14.7 Million

Bid Received Date: 1/1/2022