US 67 Corridor Study
In late 2017, TXDOT began a study of the US 67 corridor from just south of I-10 to the border at Presidio, Texas. While there had been some previous improvements related to passing lanes on portions of the roadway, there are still safety issues on the portion of the roadway between Presidio and Marfa.
The corridor plan addresses safety and operational improvements to facilitate border trade and commerce, as well as tourism. The corridor may become more significant to the energy industry in the future with a new natural gas pipeline installed along much of the route that exports natural gas to Mexico, and development of new wells in the Alpine High play.
The corridor study will be completed in 2019 and will include priority projects for consideration in various funding programs.
A link to the TXDOT website with more information on the US 67 Corridor study can be found here:
https://www.txdot.gov/inside-txdot/projects/studies/el-paso/us67-i10-presidio.html
US 67 Major Projects
Crane County
Project: Roadway Widening To A Modified Super 2 from Crockett County Line to Upton County Line
Length: 3.339 Miles
Cost: $4 Million
Bid Received Date: 11/1/2018
Crockett County
Project: Roadway Widening To A Modified Super 2 from Pecos County Line to Crane County Line
Length: 0.849 Miles
Cost: $1 Million
Bid Received Date: 11/1/2018
Pecos County
Project: Roadway Widening To A Modified Super 2 from IH 10 to 16.8 Miles South of IH 10
Length: 15.831 Miles
Cost: $19 Million
Bid Received Date: 4/1/2021
Project: Roadway Widening To A Modified Super 2 from 16.8 Miles South of IH 10 to Brewster County Line
Length: 11.663 Miles
Cost: $14 Million
Bid Received Date: 4/1/2021
Project- Roadway Widening To A Modified Super 2 From IH 10 to Crockett County Line
Length: 22.615 Miles
Cost: $27 Million
Bid Received Date: 11/1/2018
Presidio County-
Project: Construction Of Shared Use Bicycle And Pedestrian Facility A Long Us 67 In The City Of Marfa
Length: 0.36 Miles
Cost: $306,000
Bid Received Date:7/1/2020
Project: New Two-Lane Twin Bridge Structure For Southbound Traffic Into Mexico at the International Demarcation Line and Puerto Rico Street
Length: 0.659 Miles
Cost: $6.8 Million
Bid Received Date: 8/1/2017
Project: Bridge Replacement at the International Demarcation Line and Puerto Rico Street
Length: 0.659 Miles
Cost: $4.5 Million
Bid Received Date: 4/1/2020
Reagan County-
Project: Add Passing Lanes from SH 137 to Upton County Line
Length: 18.516 Miles
Cost: $25.5 Million
Bid Received Date: 3/1/2020
Tom Green County-
Project: Construct Interchange at Tractor Trail
Length: 1.246 Miles
Cost: $20.6 Million
Bid Received Date: 8/1/2018
Project: Construct Interchange at Paulann Boulevard
Length: 0.49 Miles
Cost: $11.8 Million
Bid Received Date: 8/1/2018
Upton County-
Project: Roadway Widening To A Modified Super 2 from Crane County Line to US 385
Length: 4.859 Miles
Cost: $5.8 Million
Bid Received Date: 11/1/2018
Project: Roadway Widening To A Modified Super 2 from SH 329 to US 385
Length: 17.964 Miles
Cost: $29.9 Million
Bid Received Date: 7/1/2019
Project: Roadway Widening To A Modified Super 2 from Reagan County Line to SH 329
Length: 10.267 Miles
Cost: $14.7 Million
Bid Received Date: 1/1/2022